| 22.05. – 14.06.2026 | 8:00 am – 6:00 pm |
| 15.06. – 14.09.2026 | 8:00 am – 7:00 pm |
| 15.09. – 02.11.2026 | 8:00 am – 6:00 pm |
The Seiser Alm Aerial Cableway in summer
Ride up to the summer Seiser Alm with the cable car
Hop on board! The Seiser Alm Aerial Cableway takes you and your companions – including rucksacks, pushchairs, bikes and dogs – up to the Seiser Alm in just 15 minutes. Once there, you can dive straight into your summer’s day and explore Europe’s largest Alpine pasture however you like.
The bottom station of the Seiser Alm Aerial Cableway is located in Seis am Schlern, at Schlernstraße 39. In the large outdoor car park you can park free of charge, while the underground garages are subject to a fee. There are also three charging stations for your electric car.
All further information on prices, tickets and operating times can be found here. From single tickets to family tickets, various combination tickets and annual passes, you’ll find exactly the ticket that suits your needs.
- Cable car operating times
- Online Ticket Shop
- Access to the Seiser Alm
- Regulations for dogs
- Ticket reductions
-
Opening & operating times in summerIn the 2026 summer season, the Seiser Alm gondola lift is in operation from 22 May 2026 to 2 November 2026. During this period, the Seiser Alm gondola lift operates as follows:
-
Secure day tickets and single rides conveniently from home.Avoid queues at the ticket counters and buy your day tickets or single rides for uphill and downhill trips easily online. This way, you can start your day stress-free and enjoy the Dolomites Region Seiser Alm from the very beginning – completely relaxed, without waiting in line.
Ticket purchase online will be available from May 2026.
-
Restricted daytime access to the Seiser AlmThe most comfortable way to reach the Seiser Alm is with the Seiser Alm Aerial Cableway. If you nevertheless wish to drive up to the Seiser Alm by car, please be aware that it is a protected landscape area.
When the cable car is operating, access to the Seiser Alm is closed to private traffic from 9.00 am to 5.00 pm. You can therefore drive up to Compatsch on the Seiser Alm either before 9.00 am or after 5.00 pm. Driving downhill, however, is permitted at any time. -
Using the Seiser Alm cable car with a dogBoth at the bottom and top stations of the Seiser Alm Aerial Cableway, as well as inside the cabins, dogs must—as in all public transport—wear a muzzle and be kept on a lead. Please also note that you need to purchase a separate ticket for your dog. You will find the current prices further down on this page. -
Buying tickets at reduced ratesTickets at reduced rates can only be purchased at the ticket offices of the Seiser Alm Aerial Cableway. Important: The person claiming the reduction must be present in person and show valid ID. If either of these requirements is not met, you will be charged the full ticket price. Thank you for your understanding!
-
Single ride Ascent and descent Adults 21,00 € 30,00 € Families
(2 adults with their children born after 01/01/2008)46,00 € 65,00 € Multi-journey pass
(3 return journeys per season; the pass is non-transferable)73,00 € -
To receive a reduction at the ticket office, all eligible persons must be present and able to provide proof of identity
Single ride Ascent and descent Children (2018-2026)
Wheelchair users, persons with 100% disability and blind persons
(Accompanying persons pay the regular fare.)free free Juniors (2008-2017) 13,00 € 18,00 € Seniors (Jahrgang 1960 und älter) 18,00 € 26,00 € Persons with a disability (with a valid disability certificate) 18,00 € 26,00 € Groups
Groups of at least 10 people*
Groups of at least 20 people**
19,00 €
14,00 €28,00 €
23,00 €* One person pays for the entire group; for every 10 paying persons, one additional person travels free of charge.
** One person pays for the entire group; for every 20 paying persons, two additional persons travel free of charge. For each further group of 20 paying persons, one additional free ticket is granted.
-
Please remember that at both the bottom and top stations of the Seiser Alm gondola lift, as well as inside the gondola lift cabins themselves – as in all public transport throughout Italy – dogs must be kept on a leash and wear a muzzle.
Single ride 3,00 € Ascent & descent 6,00 € -
Taking bicycles on the Seiser Alm gondola lift is subject to a fee.
Single ride
6,00 € Ascent & descent 12,00 €
Please note that bicycles are not transported on the shuttle buses (lines 2, 3, 3A, 5, 13 and 15), on the Seiser Alm Express (line 10) or on the Almbus (line 11).
-
The Combi Card is a discount card that allows you to use the Seiser Alm gondola lift, the Seiser Alm Express (line 10), the Almbus, and the shuttle buses. It can be purchased at the ticket offices of the Seiser Alm gondola lift and at the tourist offices in Kastelruth, Seis am Schlern, and Völs am Schlern. The Combi Card is personal and non-transferable.
without Südtirol Guest Pass withSüdtirol Guest Pass Dog surcharge Bicycle surcharge Combi Card 3 in 7
Damit kannst du innerhalb von 7 Tagen ab der ersten Entwertung 3 Mal eine Berg- und Talfahrt mit der Seiser Alm Bahn oder dem Seiser Alm Express (Linie 10) unternehmen. Außerdem kannst du die Shuttlebusse (Linien 2, 3, 3A, 5, 13 und 15) und den Almbus (Linie 11) uneingeschränkt nutzen.73,00 € 71,00 € 9,00 € 29,50 € Combi Card 7
Gilt ab der ersten Entwertung an 7 aufeinanderfolgenden Tagen für die uneingeschränkte Nutzung der Seiser Alm Bahn, des Seiser Alm Express (Linie 10), der Shuttlebusse (Linien 2, 3, 3A, 5, 13 und 15) und des Almbusses (Linie 11).94,00€ 92,00 € 21,00 € 38,50 € Combi Card 14
Gilt ab der ersten Entwertung an 14 aufeinanderfolgenden Tagen für die uneingeschränkte Nutzung der Seiser Alm Bahn, des Seiser Alm Express (Linie 10), der Shuttlebusse (Linien 2, 3, 3A, 5, 13 und 15) und des Almbusses (Linie 11).143,00 € 139,00 € 42,00 € 57,50 € Junioren (2008-2017) erhalten 50 % Ermäßigung auf den jeweiligen Preis. -50 % -50 % Kinder (2018-2026) sowie Menschen im Rollstuhl, Menschen mit 100 % Invalidität und Blinde (Begleitpersonen zahlen den regulären Preis.) free free
With the Südtirol Guest Pass, you receive the Combi Card at a reduced preferential rate. The Südtirol Guest Pass is available exclusively from your accommodation in Kastelruth, Seis am Schlern, Völs am Schlern, and Tiers am Rosengarten; it is included in the price of your stay and valid for its entire duration.
-
The Seiser Alm Card Gold is a benefit card valid from 01 June to 11 October 2026. It grants access to the Seiser Alm gondola lift, of the lift facilities listed below, and the various bus services in the area. You can purchase it at the ticket offices of the Seiser Alm gondola lift as well as at the tourist offices in Kastelruth, Seis am Schlern, and Völs am Schlern. The Seiser Alm Card Gold is a personal, non-transferable card.
without
Südtirol Guest Passwith
Südtirol Guest Pass
Dog surcharge Seiser Alm Card Gold 7
Valid from the first validation for 7 days within the stated period, allowing unlimited use of the Seiser Alm gondola lift, the Seiser Alm Express (Line 10), the shuttle buses (Lines 2, 3, 3A, 5, 13 and 15) and the Almbus (Line 11). In addition, you may use the Puflatsch Gondola as well as the chairlifts Spitzbühl Chairlift, Panorama Chairlift, Florian Chairlift and Marinzen Chairlift without restriction. The operating seasons of the lift facilities vary. All current schedules can be found here.136,00 € 134,00 € 21,00 € Juniors (2008–2017) receive a 30% discount on the respective price. -30 % -30 % Children (2018–2026) as well as wheelchair users, persons with 100% disability and blind persons travel free of charge.
(Accompanying persons pay the regular fare.)free free
With the Südtirol Guest Pass, you can purchase the Seiser Alm Card Gold at the listed discounted price. You will receive the Südtirol Guest Pass exclusively from your accommodation in Kastelruth, Seis am Schlern, Völs am Schlern and Tiers am Rosengarten; it is included in the price of your stay and valid for the entire duration of your holiday.
-
The season ticket grants you unlimited use of the Seiser Alm Aerial Cableway throughout the entire summer season. It is available at the ticket offices of the Seiser Alm Aerial Cableway. The season ticket is personal and therefore non-transferable
Surcharges Standard fare Almbus (Linie 11) Shuttlebus (Linien 2, 3, 3A, 5, 13 und 15) Dog Bicycle Season ticket 171,00 € 21,00 € 21,00 € 60,00 € 48,00 € -
The annual pass is valid for 365 days from the date of purchase and allows you to use the Seiser Alm Aerial Cableway throughout this period. It is available at the ticket offices of the Seiser Alm Aerial Cableway. The annual pass is personal and therefore non-transferable.
Surcharges Standard fare
Almbus
(Linie 11)Shuttlebus
(Linien 2, 3, 3A, 5, 13 und 15)Dog Bicycle Season ticket 258,00 € 35,00 € 35,00 € 72,00 € 60,00 € -
Friends Cards are bundles of 20 or 40 single rides that are transferable and valid for 730 days (2 years) from the date of purchase.
Friends 20
20 single tickets243,00 € Friends 40
40 single tickets409,00 € -
This advantage card allows you to use all ropeway systems in the Dolomites Region Seiser Alm, as well as around 100 additional ropeway systems across the entire Dolomiti Supersummer network, throughout the summer. The Supersummer Card is valid from 23 May to 9 November 2026. It is the only card that includes bike transport in the price. The card is personal and therefore non-transferable.
Dolomiti Supersummer Card Day ticket Flex pass – 3 out of 4 days Flex pass – 5 out of 7 days
Season pass Adults 67,00 € 145,00 € 185,00 €
415,00 €
Juniors (born after 01/01/2008) 47,00 € 102,00 €
130,00 €
290,00 €
Children (born after 01/01/2018)
free* free* free* 210,00 €
* If an adult purchases a Dolomiti Supersummer Card of the same type at the same time, the corresponding card for one child is free of charge.
You can find more information about the Dolomiti Supersummer Card here:
Points Value Card
Transferable points value card. Depending on the ropeway used, a specific number of points is deducted. Bicycle transport is not included.(Please note: This card is neither sold nor accepted in Val Gardena.)
Price 1.000 units 100,00 € Kinder (born after 01/01/2018) free*
* If an adult uses their Points Value Card at the same time, the ride on the respective ropeway system is free of charge for one child.
-
There are three parking options at the bottom station of the Seiser Alm gondola lift: a large free outdoor car park, the paid Walderer parking garage on two levels (P1), and the new paid parking garage at the bottom station of the Seiser Alm gondola lift (P2).
Parking Hour Day Outdoor car park (P1)
No parking from 11:00 pm to 5:00 am.
free free Parking garage Walderer (P0 / P+1) 2,00 € 8,00 € Parking garage Valley station (P-1 / P-2) 2,50 € 12,00 €
Flat rate from the 4th hour -
There are three charging stations for electric vehicles at the bottom station of the Seiser Alm gondola lift. In the Walderer parking garage (P0 and P+1), there are 2 charging stations, each with an output of 11 kW. Outside, you will find a Hypercharger with a power output of 100 kW. Using the “Neogy eMobility” app, you can view all public charging stations nearby, reserve them, start the charging process and pay.
-
If you need to get in touch with someone from the Seiser Alm gondola lift, you will find the contact details here:
Seis-Seiser Alm Bahn AG
Schlernstraße 39 | I-39040 Seis am Schlern
T +39 0471 704270
info@seiseralmbahn.it | seiseralmbahn@legalmail.it